Working with spread standards
Spread standardsare based on a previous assessment of staffing requirements on an hour-by-hour basis. Although they are most commonly used for table games, spread standards might also be used for positions for which a flow has previously been analyzed and, as a result, flexible staffing has already been established.
This tab is only available if the Standard Type is set to KBI Related. For more information, see Configuring Planner Settings.
The Standards pane is available only if a job or assignment/sub-assignment is selected. The Standards pane is not available at the property, division, or department levels.
Tasks performed on the Spread Standards tab: