Adding a spread standard

Create spread standards based on a previous assessment of staffing requirements on an hour-by-hour basis. Although they are most commonly used for table games, you might create spread standards for positions for which a flow has previously been analyzed and, as a result, flexible staffing has already been established.

This tab is only available if the Standard Type is set to KBI Related. For more information, see Configuring Planner Settings.

The Standards pane is available only if a job or assignment/sub-assignment is selected. The Standards pane is not available at the property, division, or department levels.

  1. In the upper-left corner of the screen, select Access your applications ().
    The menu expands.

  2. Select Setup > Labor Standards.
    The Labor Standards screen appears.

  1. In the Labor Structure tree menu, select the labor structure level to which you want to add a standard.
    Details for the selected labor structure appear in the right pane.

  2. From the Standard Set drop-down list, select the standard set that you want to work with.

  3. If necessary, expand () the Standards pane.

  4. Select the Spread Standards tab.

  5. The Spread Standards table appears.

  6. (Optional) To apply a standard that is associated with an environment, select one or more conditions from the Additional Environments drop-down list.

  7. To add a standard, do one of the following:

    • Above the table, select Add Standard.
      The Add Spread dialog box appears.
      or

    • Right-click any row in the table and select Add Standard.
      The Add Spread dialog box appears.

  8. From the Shift drop-down list, select the shift to which the spread standard applies.

  9. From the KBI drop-down list, select the KBI to associate with the new spread standard.

  10. In the From Volume and To Volume fields, enter the values for the KBI volume range of the spread standard.

  11. To create additional KBI volume ranges,

    • Double-click in the To Volume field.

    • Enter a number.
      The Add Range button becomes available.

    • Select Add Range.
      A new row appears with the From Volume automatically configured based on the number you entered in the To Volume field of the previous range.

    • Repeat these steps to continue adding ranges as necessary.

  12. In the calendar table, enter the amount for each time/day you want to define the spread.

    • Use the controls above the table to copy or clear your entries as necessary. 

  13. Select Save.
    The dialog box closes, and your spread standard is added to the table.